The GX Contractor Blogs

The Blogger

John Trotti Grading & Excavation Contractor Editor

More from this blogger

  1. Training It Starts with Your Image
  2. Is there a Moore's Law in Construction
  3. Technology How Much Is Enough
  4. Getting Set for Our Technology Issue
  5. World of Concrete 2010 - Still a Firm Foundation
  6. The Bottomest Line
  7. Life Beyond the School of Hard Knocks
  8. Developing and Using Standards
  9. A Late-Night Present From the Senate
  10. Commitment Rather than Change
  11. Lessons From Power-Gen
  12. The Action Desk
  13. NGVs for Fleet Operations
  14. Stimulus Funds for Infrastructural Repair Show Me the Dough
  15. Are You Ready for the GHG Emissions Inspector
  16. Do Statistics Tell the Safety Story
  17. LiDAR What is it and Why Should I Care
  18. Consolidation Happens
  19. Equipment Theft in a Tough Economy
  20. ICUEE 2009
  21. Standardization
  22. Causes That Matter
  23. Hard Hats and Safety Harnesses - but Situational Awareness Above All
  24. Signs of the Times That Make Sense
  25. The Human Element
  26. Whoop-De-Doozy
  27. Infrastructure in Dire Need of Overhaul
  28. All in it Together
  29. Pride in Accomplishment It's Part of Our Nature
  30. Y2K Plus Ten
  31. CNH Parts & Service Remanufacturing
  32. Construction Accidents Better But Still Too Many
  33. Not Like Your Father's Crawler
  34. Equipment Theft A Bigger Business Than Ever
  35. Two Days, Three Nights in Peoria
  36. Regulatory Compliance
  37. Fugitive Dust
  38. A Case for Dirtmanship
  39. Are We Still Having Fun
  40. The Best BMP for Erosion & Sediment Control is Knowledge
  41. Snoopy's Doghouse
  42. Leave Close at the Horseshoe Pit
  43. Bailouts, Stimuli, and our Future
  44. Tsunamis in the Sea of Change
  45. Rising to the Challenge of Change
  46. Fox in the Henhouse
  47. Writing Checks Our Resources Can't Cover
  48. Trenching Safety
  49. Dimensions 2009
  50. Bottom Lines
  51. Speed, Precision, and Awareness
  52. World of Concrete 2009
  53. Paperless iGrading & Excavation Contractor-i
  54. Tightening the Belt One Notch at a Time
  55. Stimulating Thoughts
  56. Start the Year with PMA
  57. Staying Out of the Crosshairs
  58. Employee Free Choice Act (FCA)
  59. Keeping Pace with Workforce Change
  60. Forward to the Future
  61. Investing in Training and Technology
  62. Focusing on the Future
  63. Southern California Fires
  64. Bottom Lines
  65. In Pursuit of the Digital Jobsite
  66. Situational Awareness
  67. Coming to Grips with Change
  68. Sweeping Up the Scraps
  69. How're the Fish Biting Today
  70. Welcome to the New Site!
view all

GX Contractor Editor's Blog

January 19th, 2009 8:45am PST

Operation Head Start

Posted By John Trotti Comments
The year was 1980, and the county administration was in the midst of its budget cycle. I was sitting in the hearing room, awaiting my turn to address the supervisors on another matter, but since I wasn’t sure when my petition would come up, I watched and listened fitfully while department heads came to the podium to plead their cases for capital and operating funds for the following year.

It was truly a ho-hum morning as Tweedle-Dums and Tweedle-Dees read figures from handwritten viewgraphs, attempting to justify their need for various amounts of the taxpayer’s money. Ho-hum, that is, until the Parks and Recreation Department director—the last and presumably least important person on the list—flopped down a spreadsheet showing where each and every dollar he was requesting would go. Not only that, but he backed the figures up with a series of brightly colored graphs showing in wonderful and easily understood detail what the benefits of the “investments,” as he called them, would be.

In the space of five minutes, he not only detailed the need for and use of his requested funds, but he offered several what-if alternatives, comparing their relative “returns on investment.” By the time he finished, everyone in the room was wide awake, marveling at the performance, each of us certain the P&R Department was going to get every dollar, dime, and penny of the basic request. Moreover, you could sense the envy of his peers turn to hostility as the other department heads realized they had been upstaged, not so much by the man himself but his use of a tool called VisiCalc…the magic application that history records as having single-handedly transformed the personal computer from plaything to industrial-grade performer.
In the 30 years since VisiCalc ushered in the personal computer era, nearly everything has changed, except for the need to convey vital information swiftly, clearly, and excitingly. Today, the tools are better, their acceptance universal, and the details they contain pretty well standardized. Where substantive differences between bids exist, the decision making process is fairly simple, but the closer things come to a toss-of-a-coin situation, the more important the presentation itself becomes.

Why the VisiCalc story? Well, Parks & Recreation received its full request, while other departments experienced trims. It’s to suggest that you take a fresh look at your presentations to make sure that they’re as vibrant and lucid as you can make them.

What Do You Think?

Post a Comment

Be the first to tell us what you think!

Post a Comment

Not a subscriber? Sign Up
 
 
*  
 




 

Get GX Contractor Email Updates!

Get weekly news and updates through our GX Contractor email newsletter!