The GX Contractor Blogs

The Blogger

John Trotti Grading & Excavation Contractor Editor

More from this blogger

  1. Training It Starts with Your Image
  2. Is there a Moore's Law in Construction
  3. Technology How Much Is Enough
  4. Getting Set for Our Technology Issue
  5. World of Concrete 2010 - Still a Firm Foundation
  6. The Bottomest Line
  7. Life Beyond the School of Hard Knocks
  8. Developing and Using Standards
  9. A Late-Night Present From the Senate
  10. Commitment Rather than Change
  11. Lessons From Power-Gen
  12. The Action Desk
  13. NGVs for Fleet Operations
  14. Stimulus Funds for Infrastructural Repair Show Me the Dough
  15. Are You Ready for the GHG Emissions Inspector
  16. Do Statistics Tell the Safety Story
  17. LiDAR What is it and Why Should I Care
  18. Consolidation Happens
  19. Equipment Theft in a Tough Economy
  20. ICUEE 2009
  21. Standardization
  22. Causes That Matter
  23. Hard Hats and Safety Harnesses - but Situational Awareness Above All
  24. Signs of the Times That Make Sense
  25. The Human Element
  26. Whoop-De-Doozy
  27. Infrastructure in Dire Need of Overhaul
  28. All in it Together
  29. Pride in Accomplishment It's Part of Our Nature
  30. Y2K Plus Ten
  31. CNH Parts & Service Remanufacturing
  32. Construction Accidents Better But Still Too Many
  33. Not Like Your Father's Crawler
  34. Equipment Theft A Bigger Business Than Ever
  35. Two Days, Three Nights in Peoria
  36. Regulatory Compliance
  37. Fugitive Dust
  38. A Case for Dirtmanship
  39. Are We Still Having Fun
  40. The Best BMP for Erosion & Sediment Control is Knowledge
  41. Snoopy's Doghouse
  42. Leave Close at the Horseshoe Pit
  43. Bailouts, Stimuli, and our Future
  44. Tsunamis in the Sea of Change
  45. Rising to the Challenge of Change
  46. Fox in the Henhouse
  47. Writing Checks Our Resources Can't Cover
  48. Trenching Safety
  49. Dimensions 2009
  50. Bottom Lines
  51. Speed, Precision, and Awareness
  52. Paperless iGrading & Excavation Contractor-i
  53. Tightening the Belt One Notch at a Time
  54. Operation Head Start
  55. Stimulating Thoughts
  56. Start the Year with PMA
  57. Staying Out of the Crosshairs
  58. Employee Free Choice Act (FCA)
  59. Keeping Pace with Workforce Change
  60. Forward to the Future
  61. Investing in Training and Technology
  62. Focusing on the Future
  63. Southern California Fires
  64. Bottom Lines
  65. In Pursuit of the Digital Jobsite
  66. Situational Awareness
  67. Coming to Grips with Change
  68. Sweeping Up the Scraps
  69. How're the Fish Biting Today
  70. Welcome to the New Site!
view all

GX Contractor Editor's Blog

February 9th, 2009 9:50am PST

World of Concrete 2009

Posted By John Trotti Comments
Everyone expected a reduction in the show’s attendance—30% down from last year’s record-breaking estimate of 84,000 seems a reasonable guess—but was it as bad a scene as the numbers would suggest?

While aisles in the halls were definitely less congested than in past years, many of the exhibitors with whom I spoke felt that the quality of the attendees was superb. This was particularly true for those whose technology-based wares promised increased productivity—principally the software, machine control, and telematics vendors.

“I came specifically to look at bidding software,” one contractor told me. “Whereas a year ago I would be up against a half-dozen contractors, I already knew most of them and could guess what it would take to compete. Today there might be 40 responders to an RFP, all needing the work just to stay in business.

Being able to sharpen his pencil was just one of his concerns. Reducing the amount of time it took to prepare and deliver his bids was another. But being responsive to an RFP in a way that showed the project owner he would be able to perform according to his bid was the most critical of all, and this meant having a precise view of his business and an effective means of communicating this in his bid package.

Another contractor told me he was there to assess and purchase machine control equipment because of what the software he had bought at last year’s ConExpo showed him about his equipment utilization.

“We put a GPS unit on one of our dozers a couple of years ago but never really tracked its performance until we installed the new software,” he explained. “The difference was amazing, so we’re looking to install machine control stuff on more of our equipment.”

Perhaps the most surprising comment of the show came from a contractor who was genuinely relieved by the cool-down in his company’s activity over the past few months.

“We’ve been going so hot-and-heavy for the past several years that we’ve been throwing away money through wasteful practices. I knew we needed to make changes, but there was never time. Now that we’ve had a chance to evaluate our activities, we’re in a position to control our activities far more effectively.” Then with a rueful smile he added, “After that, the economy better improve enough to put the effectiveness to work.”

 

What Do You Think?

Post a Comment

Be the first to tell us what you think!

Post a Comment

Not a subscriber? Sign Up
 
 
*  
 




 

Get GX Contractor Email Updates!

Get weekly news and updates through our GX Contractor email newsletter!